Bamboo Network Spacing/m

Overburden Thickness/m

Equipment Grounding Stress/kPa

Allowable Bearing Capacity/kPa

Evaluation

Capacity Formula

Load Test

0.4

0.7

15.3

56.1

29.7

OK

0.5

0.7

15.3

45.8

26.5

OK

0.5

0.8

17.2

46.5

28.3

OK

0.5

1.0

21.0

48.1

30.1

OK