Bamboo Network Spacing/m | Overburden Thickness/m | Equipment Grounding Stress/kPa | Allowable Bearing Capacity/kPa | Evaluation | |
Capacity Formula | Load Test | ||||
0.4 | 0.7 | 15.3 | 56.1 | 29.7 | OK |
0.5 | 0.7 | 15.3 | 45.8 | 26.5 | OK |
0.5 | 0.8 | 17.2 | 46.5 | 28.3 | OK |
0.5 | 1.0 | 21.0 | 48.1 | 30.1 | OK |